VIRGIN ACTIVE Collins Street
 
  
  
  
  
  
Client:  
  
Architect:     
Builder:     
Aquatic Consultant:  
Works:    
Virgin Active
Leighton Contractors
Calibre Consulting
Installation of a new aquatic facility consisting of a 25 metre pool, 20 jet spa pool
  • Dosing System - Prominent Fluid Controls
  • UV System - Prominent Fluid Controls
  • Stainless pumps - Lowara
  • Pro-Cal 2520 Calcium Hypochlorite systems
  • The Project was completed in June 2015 and the construction time was fourteen months.

  P1010438.JPG - large

BROADMEADOWS LEISURE CENTRE
 
Client:    
Architect:  
Builder:  
Aquatic Consultant: 
Location:  
Works: 
Major Projects Victoria
Peddle Thorp
2 Construct
Hydrautech
Tanderrum Way
Indoor 50 metre pool 1500M33 28oC , 12Co
Indoor 25 metre pool 450M3 28oC
  • Horizontal sand filtration  -  Waterco
  • PRO-CAL Model 2520 -  Prominent Fluid Controls
  • Dosing controller Dulcomarin - Prominent Fluid Controls     
  • Medium pressure 4Kw UV     -  Prominent Fluid Controls
  • Bronze Pumps  -  Southern Cross    
Indoor Spa M3 36o
  • Deep bed sand filtration  -  Waterco 
  • PRO-CAL Model 2520 -  Prominent Fluid Controls
  • Dosing controller Dulcomarin - Prominent Fluid Controls
  • Medium pressure 2Kw UV  -  Prominent Fluid Controls
  • Bronze pumps  -  Southern Cross
Cold Plunge Pools 12oC
  • Deep bed sand filtration  -  WatercoIMG_0320SECONDPLUNGE1.JPG - large
  • PRO-CAL Model 2520 -  Prominent Fluid Controls
  • Dosing controller Dulcomarin - Prominent Fluid Controls
  •  UV system 1 Kw  -- Prominent Fluid Controls
  • Bronze pumps  -  Southern Cross
All three pools are heated and cooled by the central plant on the site.  The project was completed in May 2010.
 
IMG_0316STADIUMPLANT1.JPG
Picture1(NAME)-1.jpg
IMG_0320SECONDPLUNGE1.JPG
CARLTON FOOTBALL CLUB
 
Client:
Architect: 
Builder:   
Aquatic Consultant: 
Works:      
Carlton Football Club
 
Johns Lyng Group
Peter Snelling
15 metre indoor warm water exercise pool 34oC
2 x cold Vaso treadmill pool 10-12oC
1 x hot Vaso treadmill pool 40oC
Concrete cell filter design
Ozone/Bromine System
Chiller and boiler plant
State of the art PILC switchboard

 

The Carlton Football Club project is the first of its kind in Australia with underwater treadmills which operate in the hot and cold Vaso pools.  With the intense speed of the modern day AFL game, recovery has become a vital part of football clubs' preparation each week.
 

Other Completed Projects

  • 150 Clarendon Street
  • Alto Apartments
  • Atlantis Hotel
  • Anaconda Kayak Pool
  • Austin Health & Rehab Centre
  • Balencea Apartments
  • Ballarat Aquatic Centre
  • Bellarine Aquatic Centre
  • Benalla Aquatic Centre
  • Broadmeadows Leisure Centre
  • Carlton Football Club
  • City Square - Westin Hotel
  • Crown Metropol Hotel
  • Dandenong Hospital
  • Eastern Beaches Pool
  • Eureka Towers
  • Fitzroy Leisure Centre
  • Frankston Hospital
  • Geelong Football Club
  • Horsham Aquatic Centre 
  • Kooyong Tennis Club
  • Leongatha Leisure Centre
  • Melbourne Aquarium

 

 

 

  • Melbourne Crown Casino
  • Melbourne Rectangular Stadium
  • Melbourne University Beaurepaire Pool
  • Mentone Grammar
  • Mornington Peninsula Shoire - Pool
  • Noble Park Aquatic Centre
  • Nunawading Aquatic Centre
  • Qantas Flight Centre
  • RACV City Club
  • RACV Healesville
  • RACV Inverloch
  • Richmond Aquatic Centre
  • Richmond Football Club
  • Royal South Yarra Tennis Club
  • Sandringham Leisure Centre
  • Sunshine Leisure Centre
  • Torquay Sands
  • The Resort Torquay
  • Virgin Active Melbourne
  • Werribee Outdoor
  • Wyndham Aquatic Centre
  • Yarra Junction Aquatic Centre